The Requirement
Bonatti, the primary contractor, were asked to engage a professional technical writing company to write and deliver the Operating and Maintenance Manual for their section of the Trans Adriatic Pipeline.
The Project
Orchid produced an Operating and Maintenance Manual to assist the Pipeline Operators to operate and maintain the pipeline, block valve stations etc. of the Greek section of the pipeline.
In addition, a separate Pigging Operations manual was produced.